A partial list of the completed projects North Pacific Erectors has served as general contractor for. Each project includes details about the type of construction and when available the listing will include progress photos and/or completed project photos. |
|

Location: 400 Willoughby Ave
Owner: Juneau Business Center, LLC
Project Manager: Chad Strong
Scope of Work: Removal of existing EIFS system at south wall, structural steel and stud repairs, new installation of rigid foam installation, VaproShield® Air Barrier, metal flashing and new siding. Interior improvements include new trim at the windows along the south wall and new sheetrock and finishes in the stairwell, re-finished stairs and railings and the installation of new rubber base
|
|
Read more...
|
|
The Anderson Building joins one of the few North Pacific Marine Laboratories. It provides classrooms, teaching labs, and research labs for faculty and students in the UAS biology and marine biology programs. North Pacific Erectors, as the general contractor, upgraded or replaced major building components including heating and ventilating equipment and controls, the roof membrane and insulation, new toilet rooms, interior finishes, elevator replacement, classroom and laboratory casework and the emergency generator. Interior space is reconfigured to improve effectiveness of the teaching and research areas.
|
|
Read more...
|
|
Project Information: Name: Downtown Juneau Seawalk – Taku Fisheries to Miner’s Cove Location: South Franklin Street Waterfront – Juneau, AK Owner: City & Borough of Juneau Project Manager: Mike Sturrock Scope of Work: Drive steel piling, structural steel framing, treated wood decking, install decorative handrail, architectural rain features and additional lighting and other site furnishings.
|
|
Read more...
|
|
North Pacific Erectors, as a general contractor, has successfully completed a variety of work at Coeur Alaska’s Kensington remote minesite located 45 miles north of Juneau, Alaska. NPE has been involved with Coeur Construction projects over the last 4 ½ years, beginning with the mine process facility at Kensington and ending as recently as December 2010 with the completed construction of the Kensington Tailings Treatment Facility and Comet Beach water treatment plants.
|
|
Read more...
|
|
Project Information: Name: Lake Dorothy Hydroelectric Project Location: Taku Inlet, Alaska - 30 miles south of Juneau Owner: Alaska Electric Light & Power Co. Project Manager: Karl Vandor Scope of Work: Provide all construction trade labor, materials and expertise in this design-build hydroelectric development. Construct maintenance shop & emergency crew quarters, powerhouse foundations and building, all steel penstock thrust blocks, the transformer/substation foundations, the Bart Lake Dam & Valve Vault intake structure, the Lake Dorothy Lake Tap Tunnel Plug and Dishcharge/Drawdown piping, East Terminal site civil work and all other construction support services. Project Timeline: 2006 through 2010
|
|
Read more...
|
|
Project Information: Name: Snettisham Snow Diverters Location: Snettisham Transmission Line, Tower 4.6, South of Juneau, Alaska Owner: AEL&P / AIDEA Project Manager: Karl Vandor Scope of Work: Site clearing, rock drilling, site surveying, rock anchor installation, foundations, and installation of steel snow diverters by means of heavy lift helicopters located approximately 4.6 miles from the Snettisham Hydroelectric Project along the Snettisham Transmission line.
|
|
Read more...
|
|
Project Information: Name: St. Paul’s Catholic Church Location: 9055 Atlin Drive, Juneau, Alaska Owner: St. Paul’s Catholic Church Project Manager: Karl Vandor Scope of Work: Construct church and all exterior site improvements.
|
|
Read more...
|
|
|
|
|
|