Completed Projects

A partial list of the completed projects North Pacific Erectors has served as general contractor for. Each project includes details about the type of construction and when available the listing will include progress photos and/or completed project photos.

400 Willoughby Exterior Upgrades

 

   

   

 

  

  

  

Location:  400 Willoughby Ave

Owner:  Juneau Business Center, LLC

Project Manager:  Chad Strong

Scope of Work:  Removal of existing EIFS system at south wall, structural steel and stud repairs, new installation of rigid foam installation, VaproShield® Air Barrier, metal flashing and new siding.  Interior improvements include new trim at the windows along the south wall and new sheetrock and finishes in the stairwell, re-finished stairs and railings and the installation of new rubber base

 

 
Read more...
 
Anderson Building Remodel

The Anderson Building joins one of the few North Pacific Marine Laboratories. It provides classrooms, teaching labs, and research labs for faculty and students in the UAS biology and marine biology programs.  North Pacific Erectors, as the general contractor, upgraded or replaced major building components including heating and ventilating equipment and controls, the roof membrane and insulation, new toilet rooms, interior finishes, elevator replacement, classroom and laboratory casework and the emergency generator. Interior space is reconfigured to improve effectiveness of the teaching and research areas.

Read more...
 
Downtown Juneau Seawalk – Taku Fisheries To Miner’s Cove

One of the architectural rainfall features for the Downtown Juneau Seawalk. Project Information:
Name:  Downtown Juneau Seawalk – Taku Fisheries to Miner’s Cove
Location:  South Franklin Street Waterfront – Juneau, AK
Owner:  City & Borough of Juneau
Project Manager:  Mike Sturrock
Scope of Work:  Drive steel piling, structural steel framing, treated wood decking, install decorative handrail, architectural rain features and additional lighting and other site furnishings.

Read more...
 
Kensington Mine Tailing Treatment Facility

North Pacific Erectors, as a general contractor, has successfully completed a variety of work at Coeur Alaska’s Kensington remote minesite located 45 miles north of Juneau, Alaska. NPE has been involved with Coeur Construction projects over the last 4 ½ years, beginning with the mine process facility at Kensington and ending as recently as December 2010 with the completed construction of the Kensington Tailings Treatment Facility and Comet Beach water treatment plants.

Read more...
 
Lake Dorothy Hydroelectric Project

Project Information:
Name: Lake Dorothy Hydroelectric Project
Location: Taku Inlet, Alaska - 30 miles south of Juneau
Owner: Alaska Electric Light & Power Co.
Project Manager: Karl Vandor
Scope of Work: Provide all construction trade labor, materials and expertise in this design-build hydroelectric development. Construct maintenance shop & emergency crew quarters, powerhouse foundations and building, all steel penstock thrust blocks, the transformer/substation foundations, the Bart Lake Dam & Valve Vault intake structure, the Lake Dorothy Lake Tap Tunnel Plug and Dishcharge/Drawdown piping, East Terminal site civil work and all other construction support services.
Project Timeline: 2006 through 2010

 

Read more...
 
Snettisham Snow Diverters

Project Information:
Name: Snettisham Snow Diverters
Location: Snettisham Transmission Line, Tower 4.6, South of Juneau, Alaska
Owner: AEL&P / AIDEA
Project Manager: Karl Vandor
Scope of Work: Site clearing, rock drilling, site surveying, rock anchor installation, foundations, and installation of steel snow diverters by means of heavy lift helicopters located approximately 4.6 miles from the Snettisham Hydroelectric Project along the Snettisham Transmission line.

Read more...
 
St. Paul’s Catholic Church

Project Information:
Name: St. Paul’s Catholic Church
Location: 9055 Atlin Drive, Juneau, Alaska
Owner: St. Paul’s Catholic Church
Project Manager: Karl Vandor
Scope of Work: Construct church and all exterior site improvements.

Read more...